Pitline

6239957856518521201.jpg

6239957856518521201.jpg

6224166855203997083.jpg

6224166855203997083.jpg

PitLineDetails.csv.csv

Zone Division Depot Status Of PitLine Whether As per CAMTECH Design Pit Line Name/No. Coach Capacity LHB Coach Capacity ICF Length Of PitLine(meter) Depth of pit line as per CAMTECH standard or higher Availability of Illumination in Pit Availability of Illumination Below Catwalk Availability of Illumination Above Catwalk Provision of Electric Connection for Battery Charging RMPU testing without Power Car Availability of Electric connection for mechanized cleaning machine (at least one connection for every 3 coaches) Provision for Power car Fueling Availability of Permanent Ladder with interlock for VB roof Whether adequate drainage provided to prevent water logging dequate compressor capacity with pneumatic piping Average Pit Depth(mm) Availability Of PitLight Over head/ Column Light Provision Of OHE/TopWire Availability Of CCTV Provision Of Catwalk Provision Of Watering Facility Scope Of Extension Of PitLine Rake Test Rig Make of Rake Test Rig Date of Commissioning of Rake Test Rig Target Date Cat Walk Condition Covered Shed Availability Of Welding Points Updated By Updated On
NFR LMG AGTL Available/Commissioned No 8 23 24 552.0 Yes Yes Yes Yes Yes Yes No No No Yes Yes Yes No Yes Yes No Manual Computerized Computerized No 9957553405 21/02/2025
NFR LMG AGTL Available/Commissioned No 9 23 24 552.0 Yes Yes Yes Yes Yes Yes No No No Yes Yes Yes No Yes Yes No Manual No 9957553405 21/02/2025
NFR LMG AGTL 9957553405 21/02/2025
NFR LMG AGTL 9957553405 21/02/2025